Global Facilities Construction Schedule Control Manager
Micron Technology · Singapour
Descripcion del puesto
About the role
The Global Facilities Construction Schedule Control Manager will lead the planning, scheduling, and risk management of construction projects worldwide. This role ensures compliance with global processes, integrates 4D BIM models, and collaborates across engineering, procurement, finance, and field teams.
Key responsibilities
- Drive compliance with defined global construction processes and procedures.
- Develop and maintain comprehensive documentation, including process frameworks, audit reports, and project controls guidelines.
- Serve as the primary interface between line planning, engineering, construction, procurement, and finance on scheduling and risk matters.
- Partner with the BIM team to align 4D BIM models with construction schedules throughout the project lifecycle.
- Lead the creation, maintenance, and governance of master project schedules using Primavera P6 and Microsoft Project.
- Conduct CPM analysis, float analysis, schedule variance reporting, and look‑ahead scheduling.
- Perform schedule compression, time‑cost trade‑off analysis, and generative scheduling techniques.
- Develop and maintain the project risk register, execute probabilistic risk analysis with Oracle Primavera Risk Analysis, and facilitate risk workshops.
Required profile
- Proven experience in global construction scheduling and project controls.
- Strong understanding of schedule governance, WBS structures, and critical path methodology.
- Ability to collaborate with multidisciplinary teams and lead risk management activities.
Required skills
- Primavera P6
- Microsoft Project
- Autodesk Navisworks
- Bentley Synchro (or equivalent 4D BIM tools)
- Oracle Primavera Risk Analysis (PRA)
- Monte Carlo simulation and probabilistic schedule risk analysis
- CPM and float analysis
- Schedule compression and acceleration techniques
Questions fréquentes
Por que reporta esta oferta?
Postula en 30 segundos
Ingresa tu email para postular. Se creara una cuenta automaticamente.
Al continuar, aceptas nuestras condiciones de uso.
Ya tienes cuenta? Iniciar sesion
Publicado hace 21 horas
Expira en 1 mes
12 vistas · 0 candidaturas
Aumenta tus posibilidades
Sube tu CV: te propondremos las ofertas que coinciden con tu perfil.
Analizando tu CV...
Micron Technology
Singapour