QA/QC Manager – Data Center Construction (East Singapore)
SEARCH INDEX PTE. LTD. · Singapore
Job description
About the role
We are seeking an experienced QA/QC Manager to lead the quality assurance and control programme for a new data centre project in Singapore's East area. You will ensure that all construction activities meet contractual, drawing and specification requirements while adhering to industry standards.
Key responsibilities
- Develop and maintain the Project Quality Plan, inspection checklists, procedures and reporting system.
- Review construction documents, material submissions and inspection records for completeness and compliance.
- Conduct and coordinate site inspections for civil, architectural and M&E works.
- Monitor materials, equipment and workmanship delivered to site.
- Manage defects, non‑conformance reports, punch lists and corrective actions through closure.
- Chair regular quality meetings and track outstanding issues.
- Supervise QA/QC inspectors and ensure proper documentation.
- Identify quality risks early and implement preventive or corrective measures.
- Drive continuous improvement throughout construction and handover.
Required profile
- Diploma or Degree in Civil Engineering or a related discipline.
- Experience in constructing data centre projects is preferred.
- Familiarity with data centre construction quality requirements, testing and commissioning procedures.
- Knowledge of relevant standards such as ISO 9001, ANSI/TIA‑942, ASHRAE, Uptime Institute Tier, ASTM, ACI and Singapore Standards.
- ISO 9001 Auditor, TIA‑942, Uptime Institute, commissioning or Green Mark certifications are advantageous.
Required skills
- ISO 9001
- ANSI/TIA‑942
- ASHRAE
- Uptime Institute Tier
- ASTM
- ACI
- Singapore Standards
What we offer
- Permanent position with a competitive salary of SGD 7,000‑10,000 per month.
- Basic salary up to $10K plus variable bonus.
- Opportunity to work on a flagship data centre project with a leading A1 main contractor.
- Professional development and exposure to international standards.
Questions fréquentes
Why are you reporting this job?
Explore further
Salaries, guides and searches in Singapore.
Salaries by job title
Apply in 30 seconds
Enter your email to apply. An account will be created automatically.
By continuing, you accept our terms of use.
Already have an account? Login
A question about this job?
Ask it here: you will get the full job summary by e-mail, right away.
Published 1 month ago
Expires 4 weeks from now
45 views · 0 interested
Boost your chances
Upload your CV — we will match you with relevant openings.
Analyzing your CV...
SEARCH INDEX PTE. LTD.
Singapore
Related job offers
-
Assistant Director – Facilities Operations & Safety
Singapore Institute of Technology Singapore -
Naval Architect – Salvage Projects
Boskalis Singapore -
Site Engineer – Material Handling Systems
BEUMER Group Singapore -
Senior Research Fellow – Land Reclamation
Singapore Institute of Technology -
Senior Mechanical Engineer – Power Plant & Water Systems
AECOM Singapore